Fast Forward...Today marks an important day...the first visible signs of progress! Behind the green wooden walls a lot has been done. A very difficult hole was dug in the basement and a sewer ejector installed. The dirt basement was trenched and all sewer lines laid down. Throughout the building the fresh water pipes have been 80% completed. The elevator shaft has been plumbed. The fire extinguisher system is being tested, and repairs made.
here is a few pictures of the visible action: Front Glass being installed. My new hard hat was a comforting prescence, though i stood there only long enough to take the picture.